Home charging tender
Reference the right charging provider before the first electric deliveries:
- Select a home charging provider before the first deliveries
- Ensure connectivity with Winflotte for tracking and reimbursement of costs
- Present the selected provider to the CSE in March 2026
Key figures and context
- 109 passenger vehicles including 20 BEVs delivered in H1 2026
- 1 fleet manager in place (Winflotte): technical compatibility required
- Alignment required with group practices in Europe (Benelux)
Mission timeline
- Phase 1: Tender launched with 2 providers (interfaced with Winflotte)
- Phase 2: Quantitative analysis: purchase costs, installation, and monitoring/reimbursement packages
- Phase 3: Qualitative analysis: completeness of the offer, coverage of costs outside the package
- Phase 4: Final selection, client × provider introduction, contracting
Our added value and results
- Knowledge of charging players and Winflotte integration criteria to guide the choice without trial and error
- Structured quantitative and qualitative analysis framework for an objective decision that can be defended in the CSE
- End-to-end management of the RFP within a tight timeframe without excessive client involvement
- 1 provider referenced on time
- Winflotte connectivity operational
- March 2026 CSE deadline met
- employee communications kit
You might also be interested in
-
Optimization of taxation and transmission of electricity and natural gas for a distillation industry
- Optimize performance
- Procurement performance
-
Electricity tender for a highly multi-site water sector professional
- Optimize performance
- Procurement performance
-
Analysis of the current state, definition of the strategy and the MT model
- Optimize performance
- Procurement performance